Smart Rooftop Logistic

100% Deductible ...
that’s the HERM advantage*

Since 2018, HERM Logic has been redefining rooftop logistics by eliminating the invisible inefficiencies that quietly drain contractor margins.

#1 Patented logistics system synchronizes labor with real‑time ground‑to‑roof material demand, creating job sites that are smarter, safer, and consistently more profitable.

#2 Turnkey solution with Work SMART workflows empowering contractors to work faster, safer, and with complete control over rooftop access.

#3 Removing manual lifting, reducing crane dependency, improving material flow, and minimizing on‑site risk. 

By delivering measurable ROI, enhanced compliance, and a new level of operational certainty - HERM Logic help contractors to reclaim time, protect their crews, and strengthen project profitability in fragmented and highly competitive industries.

ONE Solution for All Rooftop & Elevated Logistic Needs

“The Power of ONE: One system, one solution, one standard. HERM Logic is revolutionizing rooftop logistics by uniting safety, efficiency, and profitability into a single, proven platform.”

Smart Game-changing Solutions for All Industries

HERM Logic lifts streamline rooftop work, cutting costs and boosting productivity

ROOFTOP Roofing

“Faster, Safer, More
Predictable Roof Access”

ROOFTOP Solar & HVAC
BUILDING
Services & Maintenance

1. Dramatically Faster Material Movement

Inclined lifts eliminate slow, dangerous manual hauling and reduce crane dependency, enabling continuous material flow and faster roof‑up productivity.

2. Safer Handling at Height

By removing the need to carry 40–80kg loads up ladders or scaffolding, lifts reduce fatigue, slips, falls, and workers’ compensation exposure — a major advantage in one of the deadliest trades.

3. FRP Advantage: Non‑Conductive, Non‑Corrosive, Lightweight Strength

HERM’s FRP construction makes it the only lift system in the world that is non‑conductive (critical around power lines), non‑corrosive (ideal for coastal roofing), and the lightest yet strongest system for rapid setup on any roof pitch.

“Precision Lifting for High‑Value Equipment”

“Reliable Access for
Multi‑Trade Operations”

1. Damage‑Free Transport of Panels,
Units & Tools

Inclined lifts provide controlled, vibration‑free movement of fragile solar panels, HVAC condensers, and electrical components — reducing breakage and warranty claims.

2. Increased Crew Efficiency & Reduced Install Time

Teams stay on the roof installing instead of hauling. This boosts daily output, accelerates project timelines, and increases revenue per crew.

3. FRP Safety: Zero Conductivity for Electrical Work

HERM’s FRP system eliminates electrical conduction risk when working around live circuits, inverters, metal frames, and rooftop wiring — a major safety upgrade over aluminum‑based lifts.

             

1. Versatile Lifting for Multi‑Material Workflows

Inclined lifts support tools, replacement parts, windows, cladding, repair materials, and maintenance equipment — ideal for facility managers, strata, and service contractors.

2. Reduced Labor Fatigue & Injury Risk

Maintenance teams avoid repetitive strain from carrying loads up stairwells, ladders, or external access points, improving long‑term workforce health and reducing downtime.

3. FRP Durability: Weather‑Proof, Rust‑Proof, Long‑Life Asset

HERM’s FRP construction resists corrosion, salt, chemicals, and moisture — perfect for long‑term building maintenance, coastal environments, and high‑humidity service work.

               

... we have a HERM Rooftop Logistic Kit
that is "just right for you"

M09 - Starter Kit
black blue and yellow textile
black blue and yellow textile

Module A: 1 x 2m/6.5ft Base Frame Module
Module B: 1 x 2m/6.5ft Extension Frame Section
Module C: 1 x 1.5m/4.9ft Extension Frame Section
Module D: 1 x 1m/3.2ft Extension Frame Section
Module E: 1 x 1.5m/4.9ft End-Frame Module
Module F: 1 x 1.6m/5.2ft Articulating Eave Module
Module H: 1 x Roof Support Frame (“A” Frame)
Module L: 1 x Cargo Chassis/Cart
(Standard: AS1418.8 / Cl. 3.5.4)
Module M: 1 x Cargo / Multipurpose Material Transporter

1 x HERM260 DC Winch (110/120V 60Hz) or (230/240V 50Hz). Includes
33m anti-rotation wire-rope (Load capacity: 25,5kN),
2 x limit-switch (to be connected to Module A and Module E),
9 x spring electromagnetic failsafe brake,
1 x 10m/32ft wired pendent control &
1 x 100m/328ft Wireless (Remote) Control.

Operating Power (Selection Option)
AU 230v/240v 50hZ with AUS/NZ Type 1 3pin power plug
EU 230v/240v 50hZ with EU Type 1 3pin power plug
UK 230v/240v 50hZ with UK Type 1 3pin power plug
US 110v/120v 60hZ with US/Canada Type B 3pin power plug

This is not a Rental Delivery Service. It is Your Equipment, working for every job, every day.

HERM Material Lift
Starter Kit (Model M09)

The HERM Material Lift Starter Kit (M09) is a contractor-owned rooftop logistics solution designed to eliminate delivery delays, reduce manual handling, and put direct cost savings back into each project’s bottom-line profit.

With a reach of 9.6m (31.5ft), the M09 includes all core lifting, operating, and safety systems required to safely transport tools and materials from ground to rooftop — on your schedule, under your control.

Built for Roofing, Rooftop Solar, HVAC, and Building Contractors, the Starter Kit enables crews to:

  • Move materials on demand, not when a distributor can fit you in

  • Reduce labor time, re-handling, and fatigue

  • Improve site safety and compliance

  • Accelerate installation timelines

  • Deliver projects at the Lowest Cost to Business (LCB)

Need More Reach or

Rooftop Coverage?

a man riding a skateboard down the side of a ramp
a man riding a skateboard down the side of a ramp
white concrete building during daytime
white concrete building during daytime
M16 -Extension Kit
M12 - Extension Kit

For More Reach or Rooftop Coverage?

For taller buildings, greater reach, or the ability to traverse larger rooftops, step up to the HERM Plus Kits:

M12 | M16 | M22

These kits add height extensions (modules) plus ground, wall, and rooftop support systems - allowing you to:

  • Deliver tools and materials exactly where they are needed

  • Reposition quickly across large or complex rooftops

  • Maintain productivity as project scale increases

On Demand. On Site. On Your Terms.

black blue and yellow textile
black blue and yellow textile

With M12 Plus, you can extend the M09 Starter Kit from 9.6m/31.5ft to a maximum length of 12.6m / 41.3ft ... equivalent to 3 stories COMM/RESS building.

M12 Extension Equipment List

Module B: 1 x 2m/6.5ft Extension Frame Section

Module D: 1 x 1m/3.2ft Extension Frame Section

Module G: 1 x “I” Frame Rooftop (or Level) Support (Module)

Module J: 1 x 2pce 4.0m/13.1ft Ground Support Prop (Module)

Module K: 1 x 2pce Wall Support Prop (Module)

M22 -Extension Kit

Extend Lift Reach from
9.6m to 12.6m / 41.3ft

With M16 Plus, you can extend the M09 Starter Kit from 9.6m/31.5ft to a maximum length of 16.6m / 54.5ft ... equivalent to 4 stories COMM/RESS building.

M16 Extension Equipment List

Module B: 2 x 2m/6.5ft frame extensions

Module C: 1 x 1.5m/4.9ft frame extension

Module D: 1 x 1m/3.2ft frame extension

Module G: 2 x “I” Frame Rooftop (or Level) Support Modules

Module I: 1 x 3pce 6.0m/19.1ft Ground Support Prop Module

Module J: 1 x 2pce 4.0m/13.1ft Ground Support Prop Module

Module K: 1 x 2pce 1.5m/4.9ft Wall Support Prop Module

Extend Lift Reach from
9.6m to 16.6m / 54.5ft

Extend Lift Reach from
9.6m to 22.6m / 74.2ft

With M22 Plus, you can extend the M09 Starter Kit from 9.6m/31.5ft to a maximum length of 22.6m / 74.2ft ... equivalent to 4 stories COMM/RESS building.

M22 Extension Equipment List

Module B: 3 x 2m/6.5ft frame extensions

Module C: 1 x 1.5m/4.9ft frame extension

Module D: 2 x 1m/3.2ft frame extensions

Module G: 3 x “I” Frame Rooftop (or Level) Support Modules

Module I: 1 x 3pce 6.0m/19.1ft Ground Support Prop Module

Module J: 1 x 2pce 4.0m/13.1ft Ground Support Prop Module

Module K: 1 x 2pce 1.5m/4.9ft Wall Support prop Module

HERM260 DC Winch: Modified to support 45m anti-rotation wire-rope (Load capacity: 25,5kN), and 23m Limit-Switch Cable Extension

Stranded Equipment

Dual Control - Toggle-Switch
[“I-0-II”]

From the Control Panel, you can seamlessly switch / toggle between:
["I"] 10m/32.8ft Wired Controller
["0"] Power-Off
["II"] 100m/328ft Remote Controller

Engineered & Built to Last! ... that the HERM Quality Promise!

Stranded Equipment
Stranded Equipment

Dual Limit-Switch's

For Your Safety, the HERM250 and HERM260 Electric Winch is equipped with 2x Limit-Switches. One is located near the Winch, and the other is located at the Receiving-End.

Stranded Equipment

Multi-Purpose Transport Bin

CLOSED for transporting, Tiles, Bricks, Tubs, Bags, Tools, etc.; and
OPEN for Solar Panels, HVAC, Doors, Windows, Floorboards, Roof Metal Sheeting, Roofing-bords, Lumber, etc.

Stranded Manufactures Guarantee

2 Year RTB Warranty

Return to Base Replacement Warranty - all faulty parts and components

[ twice the industry standard ]

Industry Compliance

Design & Engineering: Australia & German
Manufacturing: Brazil, China & Malaysia
(Made in USA: Scheduled for 2026/27)
Power: 110/120V 60Hz & 220/230V 50Hz
3 Pin Power Plug
Standard Compliance: ISO9001, AS1418.8, EN131, ANSI-ASC A14.5-2017
Cable Break Brake Standard: AS1418.8

The HERM250 and HERM260 Electric Winch is a 2kW/2.7ph and rated for Safe Lift Load of 260kg/570lbs. Travel Speed is 20m/65ft per/min. Wire Cable is anti-rotation 6mm, Grade 1960 with 19x7 Twist and Load Capacity of 25,5kN. Includes a 9x Spring Electromagnetic Disk Brake.

Stranded Equipment
Stranded Equipment

All New Gen 3 Module "L"

Int. Std: AS1418.8 / Cl 3.5.4

Stranded Equipment

Base Module "A"
Includes a lean-angle indicator, non-slip swivel footing and ground anchors to secure from slipping.

As a manufacture of WorkSMART and WorkSAFE solutions, the HERM Lift-conveyors are designed, built and approved to comply with stringent ANZ, CE/EU, US. standards.

Integrated into the chassis, is a mechanical 'Cable Break Brake System'. IF/Should the 6mm anti-rotation, 25,5kN wire cable was to fail, for any reason, the break will activate.

All New Gen3

Module "F"

Can be adjusted and set to match any roof pitch angle ... from 5/deg's to 85/deg pitch

Transforming Rooftop Logistics

from Legacy Practices ... One Contractor at a Time!

Since 2018, HERM Logic has been an industry disruptor and a game-changer for Contractors - making job sites safer, more productive AND profitable.

Built for Contractors
Safe and Efficient

HERM turnkey material lifts replace manual hauling and eliminate hidden distributor delivery costs and third-party rooftop logistics fees.

By owning the lift, contractors control rooftop access, timing, and material flow—reducing labour strain, avoiding delivery mark-ups, and increasing project margins.

HERM is a recession-resilient capital tool: compliance-ready, immediately deployable, and 100% tax deductible where applicable. The result is consistent cost control and improved profitability across every job.

What Our Customers Say ...

We are an all girl Kiwi team. The HERM lift system enable us to quickly set-up the site and start work. I have estimated cost saving of between 45% and 55%

Jill Monroe, Owner, JM Roofing

★★★★★

We already had a GEDA ladder lifter. Based on the HERM lifter specs, we expected some improvements.

I am blown away on how quickly we can now complete an install

Felix Smith, All Solar

I was still skeptical after seen the HERM lifter at 2 trade shows and spoken to several users. The HERM material ladder lifter has to be my best investment

Andy McNab, Roof & Solar Services

★★★★★
★★★★★

Get a Quote (RFQ)

To earn and retain the position as the #1 rooftop logistics system, HERM Logic focuses on doing a few critical things exceptionally well.

We design, engineer, and manufacture solutions driven directly by customer requirements, not assumptions.

We price competitively and include free delivery, ensuring genuine value for money with no hidden costs. And we stand behind our equipment with a two-year warranty—double the industry standard, reflecting our confidence in performance, reliability, and long-term durability.

This RFQ invites you to evaluate a system built to reduce cost, increase productivity, and perform where it matters most—on the roof - at the job site!